Tremie concrete placement

Facebooktwittergoogle_pluslinkedinFacebooktwittergoogle_pluslinkedin

jcgillen

Two concrete trucks discharge into hoppers at the beginning of a deep foundation tremie pour. When the hoppers fill, the cranes lift the hoppers allowing the concrete to push the tremie plugs out the bottom of the tremie pipes and start flowing into the excavation. As the concrete rises the bentonite slurry is pumped back to the plant.

Related Posts